The next part in the process is to start to build up your rails. I cut up the pallets into 6mm strips and then start gluing. I like to make my rails two strips, 12mm, thick so I have some leeway when shaping the rails. This process takes time as each strip takes 6 hours or so to set. You also need lots of clamps. I find this the easiest way to bend the rails neatly. There are other ways to do this so whatever suits your needs.
0 Comments
Leave a Reply. |
AuthorGareth Smith is the brains behind GWS wooden Surfboards and Art Archives
January 2018
Categories |